Please select parameters

Ensuring high consistency for every alloy resistor
  • Resistor
    搜索无结果
  • Power/Current
    搜索无结果
  • Max. Accuracy
    搜索无结果
  • Temperature Coefficient
    搜索无结果
  • Size
    搜索无结果
Selected parameters:
reset options
application filter

Resistor Process

01.
IQC Incoming Quality Control
02.
Stamping & Forming
03.
Degreasing & Cleaning
04.
Polishing & Washing
05.
Passivation & Rinsing
06.
Spin Drying
07.
AOI Visual Inspection
08.
Laser Marking & Packaging Test
09.
FQC Final Quality Control
010.
Packaging & Warehousing
011.
OQC Outgoing Quality Control
Resistor Production Capacity

Resistor Production Capacity

The facility has 8 electron beam welding lines, 9 stamping lines, 3 cleaning lines, and more than 30 pieces of equipment in the testing and packaging workshop.
Daily production capacity:

  • 400K+

    2512/3921/5931 Daily Production Capacity

  • 200K+

    1216/4026/2726 Daily Production Capacity

Alloy Resistor Workshop

Packaging & Testing Machine
Packaging & Testing Workshop
Automatic Visual Inspection Workstation
Automatic Resistance Trimming Workstation
Stamping Workstation
Cleaning Workstation
Cleaning Workstation 2
Warehouse
/ 5 对比框

Vertically Integrated Manufacturing Process

  • Cost

    No middlemen—the lowest costs

  • Lead Time

    No logistics delays—the fastest lead times

  • Quality

    Consistent, uniform quality throughout the entire process

  • R&D

    Customized, diverse, and precise services

  • After-Sales

    Full traceability across the entire supply chain and comprehensive service

×
𐃘